Fifteen Explore deliverables. Rebuilt after every ruling.

Documents generated from house templates and filled from the record. Counts are derived, never typed. Verified after every build. Board-ready decks on top.

  • Requirements Registerxlsx
  • Conflict Registerdocx
  • Fit-Mapping Snapshotxlsx
  • Scope Gap Analysisdocx
  • Scope Reconciliationxlsx
  • Delta Backlogxlsx
  • Interface Inventoryxlsx
  • As-Is Process Narrativesdocx
  • Change Impact Analysisdocx
  • Test Scenario Seedsxlsx
  • RAID Registerxlsx
  • Business Case Inputdocx
  • Explore Readoutdocx
  • Ingest Reportdocx
  • Reviewer Guidancedocx

Counts are derived, never typed

Every number comes from the record at build time.

Verified after every build

Cross-artifact integrity checks before anything ships.

Board-ready on top

Decision log, scope funnel, landscape, estimate, timeline, KDD log.

Your templates, not ours.

Every deliverable is generated into your own house template. The library is company-wide and organised by SAP Activate phase — replace any template and the next build uses it, so what Nexora produces arrives already looking like your firm's work rather than something that has to be reformatted.

The template library: 48 templates organised by Activate phase, each with its format and an option to replace it

Inside a conflict register.

Each contradiction is a page: the question, both positions quoted to the second, a reading, a root-cause hypothesis, the consequence if never ruled, the ruling options — and then the ruling, with a name against it.

C-14 · Critical · cross-session

Is customer credit assessed before an order is released?

"We don't block anything — sales would never accept it."
S-04 · Order management · ~41:10 · R-0612
"Every order over the limit waits for finance. That is the policy."
S-09 · Finance · 00:12:48 · R-0931

Reading. A control disagreement, not an as-is difference: one room describes practice, the other policy. Six artifacts wait on it: the credit-management design, two test scenarios, the O2C narrative, a RAID entry and a training objective.

Ruling options. (a) Enforce the limit with a release step. (b) Enforce with a warning and a weekly report. (c) Record the policy as not applied and revisit in Realize.

Ruled — option (a). Decider: process owner, Order to cash. Round 3. Rejected: (b), (c).

A ruling round, end to end.

  1. The team returns its own tracker

    The conflict tracker, as a spreadsheet, filled in by the people who own the answers.

  2. Nexora diffs it, cell by cell

    Every changed cell is read against the previous round.

  3. A second agent checks it

    A second model, not the one that read the cell.

  4. Only settled answers are applied

    An answer with no name against it is applied but waits for a decider before it can close.

  5. Effects traced downstream

    Backlog, interfaces, themes, narratives, risks, test seeds, fit evidence.

  6. All fifteen rebuilt, verified, returned

    Undoable: every prior value is kept.

Every ruling narrows the estimate. You watch it move.

BaselineRound 1Round 2Round 3Round 4 8,5258,2178,2068,0937,991
−534

person-days, as rulings replaced assumptions

±3.4% → ±0.6%

uncertainty range, as open items closed

68 → 0

contradictions open, by the board review